Executive Dashboard
Modules
Utility Record
Recent Entries (Last 10)
CNG Operation
Recent Entries (Last 10)
CNG Truck Purchase
Recent Entries (Last 10)
CNG Truck Uses Log
Recent Entries (Last 10)
CNG Consumption & Costing
CNG Settings
Rated gas load (m3/hr) is used to weight machine-wise CNG cost allocation and consumption estimates. Leave blank if unknown — that machine's cost will be allocated by run-hours instead.
Production
Controls the signature panel at the bottom of the Daily Report export. Order below is the left-to-right order on the sheet.
Dyeing Production
| PI/No | W/O | Customer | Construction | Color | Machine | Qty (mtr) | Type |
|---|
Printing Production
| W/O | Party | D/No | Construction | Design | Color/Print | Machine | Fabric | Qty | Shift | Type | Remarks |
|---|
Production Reports
Boiler Run Time
| Boiler | Fuel | CNG (h) | NG (h) | Biomass (h) | Total (h) | Logged Days | Avg / Logged Day | Utilization |
|---|---|---|---|---|---|---|---|---|
| Loading… | ||||||||
Sum of all 6-7 boilers running in parallel each day — a day's total can exceed 24 hours.
Water Record
Date-wise log matching the legacy consumption sheet layout — every column here is computed live from meter readings, never stored.